MPG Contracts installed over 30,000m2 of ceiling systems at the O2 Arena. This consisted of various sizes of metal pan clip-in with fully concealed grid, Tubeline aluminium 50mm tubular ceiling system with 150mm spacings and on a radius, plasterboard MF suspended ceilings with plasterboard lighting troughs and 600 x 600mm lay-in suspended ceiling.
MPG operated an environmentally friendly management system for the recycling of waste on this project. 90% of all plasterboard, ceiling metals and drylining was recycled.