The Stour Centre in Ashford recently underwent a two year refurbishment. There were a number of design and performance issues in the early stages of this contract which were met using Rockfon Sonar tiles and Rocklink grid to tolerate the high levels of chlorine used in the pool areas.
The ceilings included curved and sloping bulkheads with specially made trims and framework.
Integrated Interior Systems also installed Komfort and metal stud partitions on this contract.