| Contract |
Clearwater Corporate Finance, Birmingham |
| Award |
Certificate of Excellence |
| Category |
Interior Fit-Outs |
| Website |
www.cpsinteriors.com/ |
| Views |
508 |
CPS Interiors installed RAL 9010, 52dB 100mm solid and curved partitioning, Tenon Vitrage frameless double glazed partitioning with 12mm glass, 49dB and Tenon standard storage wall units finished in white MFC.
Four MF raft ceilings were installed to the meeting/boardrooms and reception with recessed downlighters in the ceiling for effect.
Tektura fabric backed wall vinyls were applied to feature walls around the office and meeting room.
Flooring included Desso Scape and Desso Palatino carpet tiles and Scala walnut plank flooring.
CPS Interiors also repositioned the existing air diffusers and installed new A/C grilles to meeting rooms. Electrical works included repositioning of existing floor boxes and new power points and data sockets.
The kitchen consisted of white gloss units with slate effect worktop including two integrated fridges, zip hydro chiller and boil heater tap integrated dishwasher. Doors installed were 2700 x 926mm FD30 walnut doors each with five 150mm square vision panels finished with stainless steel door furniture.